Back to Updates
PlannedNov 2026

Integration and controlled-water validation

Cross-team testing of buoyancy, waterproofing, propulsion, calibration, logging, and the first visualization pipeline.

November shifts from component work to integrated system behaviour in controlled water.

Failures, corrective actions, and residual risks are logged before December validation.