Back to Updates
ConditionalDec 2026

Full-system validation and optional campus still-water demo

Complete controlled-water test event; campus still-water testing only if permission, weather, and safety allow.

Controlled-water validation is the required target. Approved campus water-body testing remains a stretch outcome.

Outputs include usable CSV logs, route/trend visualizations, and at least one spatial visualization where data quality permits.